Park City, Heber, Midway, and across Utah

Four-way inspection prep

Four-way inspection cleaning that keeps schedules intact

Four-way inspections depend on clear access and visibility. We prep inspection zones, remove debris, and keep mechanical areas clean so inspectors can see what they need without delays.

  • Inspection days
  • Mechanical access
  • Mid-stage cleanup
Park City custom home framing swept and cleared for a four-way inspection

What is a four-way inspection?

One visit, four systems

The four-way is the combined rough-in inspection of framing, plumbing, electrical, and mechanical (HVAC), done before insulation and drywall close up the walls. Inspectors need to see and reach all four.

Scrap in the mechanical room, packaging against a wall, or a blocked stairway slows the inspection down and can mean a return visit. That is the part we take off your plate.

Framing, wiring, and plumbing visible after four-way inspection cleaning

What's included

What four-way prep covers

  • Inspection zone cleanup

    Debris removal and cleaning in key inspection zones so systems and framing are visible.

  • Mechanical room access

    Cleanup and clear paths so inspectors and trades can move efficiently.

  • Stairways and walk paths

    Hazards cleared and access improved to required inspection points.

  • Targeted sweep-outs

    Focused sweep-outs where the inspector will spend time, not wasted effort in low-priority zones.

  • Timed to the appointment

    We can finish close to the inspection window when the schedule allows.

  • Pairs well with rough cleaning

    If the site needs broader cleanup, we combine scopes so you are not calling two vendors.

Cleaning by build stage

Where this clean fits in the build

  1. Rough cleaning

    Mid-build cleanup while trades are working: scrap, packaging, sweep-outs, and safe walk paths.

  2. Four-way inspection prep This page

    Framing, plumbing, electrical, and HVAC left visible and reachable for the inspector.

  3. Final cleaning

    Detail work on fixtures, glass, trim, and floors before walkthroughs and listing photos.

  4. Post-construction clean

    Turnover and move-in ready, with fine dust and residue removed for the owner.

Questions

Four-way inspection prep FAQ

Do you guarantee passing an inspection?

No one can guarantee an inspection outcome. What we do is improve access, visibility, and site readiness so inspection days run smoother and faster.

How soon before the inspection should cleanup happen?

Ideally within 24 to 48 hours, and sometimes the same day depending on the schedule. Text the inspection time and address so we can plan.

What areas matter most for four-way prep?

Mechanical rooms, framing areas, access paths, and any zones where plumbing, electrical, and HVAC need to be visible.

Can you coordinate directly with the superintendent?

Yes. Clear communication with the super is standard for inspection prep scopes.

Request a quote

Book four-way inspection prep

Send the address and the inspection window. Sean will confirm timing and price, usually the same day.

  1. Sean reviews your request and replies by call or text, usually the same day.
  2. Photos help. Text pictures or a short walkthrough video to (435) 695-6954.
  3. You get a clear price by scope or by the hour before any work is scheduled.

Prefer to talk it through?

I'm a
Best way to reach you